Mining test pit survey

Mining test pit survey

Client: Thessally Resources


Dual frequency bathymetric survey

Thessally Resources are undertaking exploration drilling and bulk testing within the existing Huandot Pit, located approximately 85km south of Darwin.


The existing Huandot Pit contains surface water and groundwater inflows and had been sedentary.


Rise was engaged to undertake a bathymetric survey of the test pit surface water to provide Thessally with comprehensive water volume and sedimentation modelling.  



Rise used dual frequency analysis to measure both the sediment and rock bed depths to provide a comparative analysis of sediment depth variations.


The analysis used dual frequency bathmetric survey data, XYZ coordinate date and water surface level measurement using a USV (unmanned surface vehicle).


Deliverables:

-Water volume report

-Sediment report

-Interactive visual model.

Thessally Resources are undertaking exploration drilling and bulk testing within the existing Huandot Pit, located approximately 85km south of Darwin.


The existing Huandot Pit contains surface water and groundwater inflows and had been sedentary.


Rise was engaged to undertake a bathymetric survey of the test pit surface water to provide Thessally with comprehensive water volume and sedimentation modelling.  


Rise used dual frequency analysis to measure both the sediment and rock bed depths to provide a comparative analysis of sediment depth variations.

 

The analysis used dual frequency bathmetric survey data, XYZ coordinate date and water surface level measurement using a USV (unmanned surface vehicle).


Deliverables:

-Water volume report

-Sediment report

-Interactive visual model.


Thessally Resources are undertaking exploration drilling and bulk testing within the existing Huandot Pit, located approximately 85km south of Darwin.


The existing Huandot Pit contains surface water and groundwater inflows and had been sedentary.


Rise was engaged to undertake a bathymetric survey of the test pit surface water to provide Thessally with comprehensive water volume and sedimentation modelling.  


Rise used dual frequency analysis to measure both the sediment and rock bed depths to provide a comparative analysis of sediment depth variations.


The analysis used dual frequency bathmetric survey data, XYZ coordinate date and water surface level measurement using a USV (unmanned surface vehicle).


Deliverables:

-Water volume report

-Sediment report

-Interactive visual model.


We are exper
By Anna Goat November 25, 2025
When we say our technology is built for the Tropics...
By Anna Goat October 7, 2025
Recognition of virtual gallery
By Anna Goat September 2, 2025
OBM talks - building a stronger Territory
Aerial image a
By Anna Goat July 30, 2025
Client: Northern Territory Government
By Anna Goat April 3, 2025
We are so proud to have our investment into the development of a tropical bathymetric USV (unmanned service vehicle) secure matched funding from Advanced Manufacturing Growth Centre Ltd. Current wastewater survey methods are often not fit-for-purpose for the waste water conditions in tropical Northern Australia - high debris loads and organic matter.
By Anna Goat April 3, 2025
Client: Power Water Corporation
By Anna Goat December 4, 2024
Telstra Best of Business Awards - National Pitch
By Anna Goat October 23, 2024
Transcript of Anna Goat's "Territory Success Story' talk, 23 October.
By Anna Goat October 2, 2024
Client: NT Major Events | MAGNT
By Anna Goat October 2, 2024
Virtually catch "Gary" the Million Dollar Fish - click QR